Send Message

Casting HRC40 D7G Bulldozer Front Idler Assembly

Product Details:
Place of Origin: China
Brand Name: YT
Model Number: D7G/D7H/D6D
Payment & Shipping Terms:
Minimum Order Quantity: 1PCS
Price: Negotiable
Packaging Details: Export Packaging
Delivery Time: 7-30 days
Payment Terms: L/C, T/T
Supply Ability: 10000 PCS/month

Detail Information

Features: D7G/D7H Durable Material: 50Mn Or Customer Required
Technique: Forging/Casting OEM: Available
HRC Depth: 4-10 Mm Colour: Yellow Or Black Or Customer Required
Warranty Time: 12 Months Surface Hardness: HRC40-55
High Light:

D7G Bulldozer Front Idler Assembly

,

HRC40 Front Idler Assembly

,

Casting excavator idler assembly

Product Description

Crawler Machine Front Idler Assembly High Bearing Area D7G Bulldozer Components

 

1. What is an idler?

 

Splined connection between idler and shaft provides more bearing area and better torque transfer, increasing reliability and matching idler life with that of other lower works components.Rotating shaft within stationary bushings produces less contact stress and wear.Longer crawler system life increases change-out intervals reducing employee exposure to safety risks.

 

2. Idler Characteristic

 

A genuine Front Idler

  • Reduces bearing stress 50% to decrease bearing loads and increase component life

  • Heavy duty rock guards protect against damage from dirt and debris

  • Helps to lower mine operating costs by extending crawler system life, minimizing unplanned downtime

  • Provides greater track efficiency by increasing bearing area and lube distribution

Increased Productivity

  • Splined connection between idler and shaft increases reliability and matches idler life with that of other lower works components

  • Bearing blocks with bushings can be removed without breaking the track

  • Dedicated lube injectors supply lubricant to critical wear surfaces

Lower Total Cost Of Ownership

  • 50% less bearing stress reduces bearing loads and increases component life

  • Rotating shaft within stationary bushings produces less contact stress and wear

  • Heavy-duty rock guard prevents dirt and debris from damaging parts

Enhanced Safety

  • Longer crawler system life increases change-out intervals reducing employee exposure to safety risks from system change-outs and component replacement

 

Casting HRC40 D7G Bulldozer Front Idler Assembly 0

 

3. Design/Structure

 

Casting HRC40 D7G Bulldozer Front Idler Assembly 1

 

 

 

4. Production Processes

 

Casting HRC40 D7G Bulldozer Front Idler Assembly 2

 

5. Hot Sale Products

 

Casting HRC40 D7G Bulldozer Front Idler Assembly 3

 

 

6. Why Choose Us?

 

 

* World-class quality

* Factory sale directly with reasonable price

* 35 years' experience in Excavator & Bulldozer spare parts manufacturing

* Flexible payment terms including T/T,L/C and so on

* Fast delivery within 30 days after contract established

* Professional sales team,quality inspection and report, maritime logistics guidance

* After-sale services:video technical support, 24h online support

 

7. Products Inspection

 

Casting HRC40 D7G Bulldozer Front Idler Assembly 4

Get in touch with us

Enter Your Message

You Might Be Into These