Send Message

High Heat Treatment Track Chain Link for D4H Bulldozer 12-18 Month

Product Details:
Place of Origin: China
Brand Name: YT
Model Number: D4H
Payment & Shipping Terms:
Minimum Order Quantity: 1 PCS
Price: Negotiable
Packaging Details: Export Packaging
Delivery Time: 7-30 days
Payment Terms: L/C, T/T
Supply Ability: 10000 PCS/month

Detail Information

Material: 40Mn2 Or 35MnBH Steel Technique: Forging/Casting
Quality: Heat Treatment HRC 40-55 HRC Depth: 4-10 Mm
Colour: Yellow Or Black Or Customer Required Warranty Time: 12-18 Months
Highlight:

Yellow Bulldozer Track Chain Link

,

40Mn2 Track Chain Link

,

35MnBH Steel Track Chain Link

Product Description

High Heat Treatment Track Chain Link for D4H Bulldozer 12-18 Month

 

1.Track Link Features

 

We are using advanced machining center, horizontal and vertical CNC machining to execute processes such as machining, drilling, threading and milling to ensure the quality and precision of each component to ensure the accuracy of assembly dimensions. This is to maximize the life span of each component and minimize production cost per hour.

 

High Heat Treatment Track Chain Link for D4H Bulldozer 12-18 Month 0

 

2. Main Dimensions of Installation

 

High Heat Treatment Track Chain Link for D4H Bulldozer 12-18 Month 1

 

MAIN PARAMETERS

 

Main Dimensions of Installation Suitable Models
P A B C E F H K L
190 160.4 124.4 62 20.5 85.6 176.4 105 47 SD13
190 160.4 124.4 62 20.5 85.6 175.6 105 47 D55/D57
190 139.7 139.7 63.5 19.5 88 186 118 56.5 TD15C
190 160.4 124.4 62 20.5 84.8 175.6 119 47 D61
203.2 178.4 138.4 72 19.5 99.6 199.6 116.4 52 D60A/D65A
202.8 171.4 133.4 76.2 19.5 102.4 193.2 121.5 52.5 D6C/D6D/955L
202.8 171.4 133.4 76.2 19.5 102.4 193.2 121.5 52.5 D6D/D6G/955L
202.8 185.3 137.3 68 20.5 101.3 192.3 125 53 D6H
203.2 178.4 138.4 72 19.5 99.6 199.6 116.4 52 D60E/F/P/S D65E
202.8 184 146 76.2 19.5 107.2 209.2 117.5 52 D7C/D7D/527C
203.2 185.3 137.3 68 21 102 195.2 132 54 D6H/D6M/D6R
216 184 146 76.2 20.5 106 209.2 129 59 D85/TY230
216 184 146 76.2 19.5 108 208 125.5 55.5 D7G
216 184 146 76.2 19.5 108 208 125.5 55.5 D7G
216 184 146 76.2 19.5 108 208 125.5 55.5 D7E/D7F/D7G
216 184 146 76.2 19.5 108 208 125.5 55.5 D7G
216 204.1 146.1 63 23.25 101 236 150 65 D8R
216 204.1 146.1 63 23.25 101 236 150 65 D8L
228.6 219.8 169 76.2 24.5 121.6 244 138 60 D155A/D150A
228.6 201.6 169.8 76.2 23 125 245 138 60 D8K/983/983B
228.6 201.6 169.8 76.2 23 125 245 138 60 D8H/983/583H

The models above are just for reference, we can't list all models here.we can supply more products as your requirement. Please feel free to send us your inquiry or email if you have any requirements.

 

3. Inspection

 

High Heat Treatment Track Chain Link for D4H Bulldozer 12-18 Month 2

 

 

4. Forging and Heat Treatment

 

High Heat Treatment Track Chain Link for D4H Bulldozer 12-18 Month 3

 

5. Our Main Products

 

Track roller, carrier roller, sprocket, idler, track chain, track bush and pin, track shoe, Bucket bushing, and pin, track cylinder, track adjuster, excavator recoil spring, bucket link, link rod, track guard, etc.

 

6. Our Advantages

 

* World-class quality

* Factory sale directly with reasonable price

* 35 years' experience in Excavator & Bulldozer spare parts manufacturing

* Flexible payment terms including T/T, L/C and so on

* Fast delivery within 30 days after contract established

* Professional sales team, quality inspection and report, maritime logistics guidance

* After-sale services: video technical support, 24h online support

 

Are you still troubled by lacking of quality excavator track link? YinTai Parts is one of the professional manufacturers and suppliers of excavator track link in China, which has high-quality products for sale. With over 30 years of experience and wide expertise, we can assure you the high quality and good performance of our products.

Get in touch with us

Enter Your Message

You Might Be Into These