E330 Excavator Forging Track Chain Link 2019119
Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | YT |
Model Number: | U30-6 |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1 PCS |
Price: | Negotiable |
Packaging Details: | Export Packaging |
Delivery Time: | 7-30 days |
Payment Terms: | L/C, T/T |
Supply Ability: | 10000 PCS/month |
Detail Information |
|||
Material: | 40Mn2 Or 35MnBH Steel | Technique: | Forging |
---|---|---|---|
Quality: | Heat Treatment HRC 40-55 | HRC Depth: | 4-10 Mm |
Colour: | Black Or Customer Required | Warranty Time: | 12-18 Months |
Finish: | Smooth | Payment Terms: | Negotiable |
Highlight: | track chain assembly,excavator track chain,U30-6 KUBOTA Undercarriage Parts |
Product Description
We are using advanced machining center, horizontal and vertical CNC machining to execute processes such as machining, drilling, threading and milling to ensure the quality and precision of each component to ensure the accuracy of assembly dimensions. This is to maximize the life span of each component and minimize production cost per hour.
MAIN PARAMETERS
Suitable Model | Main Dimensions of Installation | ||||||||
P | A | B | C | E | F | H | K | L | |
U30-6/EX30/EX35/PC30 | 101.6 | 55 | 55 | 22 | 10.5 | 35 | 76 | 63 | 26 |
SK025/SK30/SK32 | 101.6 | 65 | 65 | 22 | 10.5 | 45 | 86 | 63 | 26 |
PC20 | 101.6 | 52 | 52 | 22 | 10.5 | 32 | 73 | 65 | 28 |
PC60-3/5/DBC8060 | 135 | 99 | 72 | 43.2 | 12.5 | 45 | 105 | 75 | 35 |
EX40/EX45 | 135 | 104 | 80 | 46 | 12.5 | 52 | 105 | 65 | 30 |
PC100-2/PC100-3/HD350 | 154 | 112.4 | 82.4 | 57 | 14.5 | 49.4 | 124.4 | 87 | 40 |
R200 | 171.45 | 144.5 | 125.4 | 58.7 | 16.5 | 87.7 | 171.7 | 101.6 | 42.8 |
EX100/R900/E120 | 171.45 | 108 | 108 | 60.3 | 16.5 | 68 | 144.8 | 95 | 44 |
PC120/130-6/PC150 | 175 | 102.4 | 86.4 | 57 | 16.5 | 48.4 | 124.4 | 90 | 42 |
PC400-5/EX400-5 | 216 | 184 | 146 | 76.2 | 24.5 | 104 | 211.2 | 129 | 59 |
EX300-6/EX330-5/PC300 | 216 | 178.4 | 140.4 | 76.2 | 22.5 | 99 | 198.2 | 116 | 52 |
The models above are just for reference, we can't list all models here.we can supply more products as your requirement. Please feel free to send us your inquiry or email if you have any requirements.
3. Forging and Heat Treatment
4. Hot Sale Products
* World-class quality
* Factory sale directly with reasonable price
* 35 years' experience in Excavator & Bulldozer spare parts manufacturing
* Flexible payment terms including T/T, L/C and so on
* Fast delivery within 30 days after contract established
* Professional sales team, quality inspection and report, maritime logistics guidance
* After-sale services: video technical support, 24h online support
* You are a trader or a manufacture?
- We are an industry and trade integration business, our factory loed in Quanzhou, and our sales department is in the center of Xiamen city.
* How can I be sure the part will fit my excavator?
- Give us correct model number/machine serial number/ any numbers on the parts itself Or measure the parts give us dimension or drawing.
* How about the payment terms?
- We usually accept T/T or L/C. other terms also could be negotiated.
* What is your minimum order?
- It depends on what you are buying. Normally, our minimum order is USD5000. one 20’ full container and LCL container (less than a container load) can be acceptable.
* What is your delivery time?
- FOB Xiamen or any Chinese port: 35-45 days. If there are any parts in stock, our delivery time is only 7-10 days.
* What about Quality Control?
- We have a perfect QC system for the perfect products. A team who will detect the product quality and specifiion piece carefully, monitoring every production process until packing is complete, to ensure product safety into the container.
Enter Your Message