Send Message

25MnB Steel Track Shoes With High Strength Heat Treatment Material

Product Details:
Place of Origin: China
Brand Name: YT
Model Number: E70B/E110B/E120B/E180/E200B/E312/E320/E325/E330
Payment & Shipping Terms:
Minimum Order Quantity: 1 PCS
Price: Negotiable
Packaging Details: Standard Export Packaging
Delivery Time: 7-30 Days
Payment Terms: L/C, T/T
Supply Ability: 10000 PCS/Month

Detail Information

Material: 25MnB Steel Technique: Forging/Casting
Quality: Heat Treatment HRC 40-55 HRC Depth: 4-10 Mm
Colour: Yellow Or Black Or Customer Required Warranty Time: 12-18 Months
Package: Standard Export Packaging Shipment: By Air, Ship And Express
Highlight:

aftermarket undercarriage parts

,

undercarriage spare parts

,

25MnB Steel Track Shoes

Product Description

25MnB Steel Track Shoes With High Strength Heat Treatment Track Pads

 

1. Excavator Track shoe Features

 

* Each track shoe undergoes comprehensive hardening treatments using a spray cooling method and subsequent tempering which are suitable for pitch range from 101mm to 260mm track link.

* Our range includes a variety of track shoe specifications, from conventional to those with enhanced abrasion resistance, catering to the diverse requirements of our clientele.

* We are capable of producing both cast and forged track shoes, designed for use in mining environments and other demanding conditions.

* Constructed from a proprietary boron steel alloy, these track shoes, once subjected to the correct heat treatment, exhibit exceptional performance under conditions of bending stress and intense wear.

 

2. Main Dimensions of Installation

 

25MnB Steel  Track Shoes With High Strength Heat Treatment Material 0

 

MAIN PARAMETERS

 

Main Dimensions of Installation

Suitable Model

A

B

C

E

H

178.4

140.4

76.2

φ22.8

250

PC300/EX300-5/EX350LC-5

/PC27-7/ZAX300/SH330

178.4

140.4

76.2

φ22.8

250

184

146

76.2

φ22.8

250

EX400/EC460/PC300HD

/PC400/EX400/PC360/WY160

184

146

76.2

φ22.8

250

184

146

76.2

φ24.6

247

PC400-5/6/PC300HD-3/5

/PC360LC-1/3/5

184

146

76.2

φ24.6

247

184

146

76.2

φ19.5

250

D95S

190

140

76.2

φ23

250

E330/SK300/SK400

190

146

76.2

φ20.5

247

ZY65

178.4

138.4

72.2

φ20.5

236

PC300-1/3/5/PC250LC-6/PC300-5

/DH280/EX300-3/EX270

178.4

138.4

72.2

φ20.5

236

184.15

146

76.2

φ20.5

236

FH300/330/R450

179

129

72

φ21.0

236

325/E325ST

160.4

124.4

62

φ20.5

219

DH220/EC210BLC/R220/

SK230/PC230/PC220/PC200-5/6/7

160.4

124.4

62

φ20.5

219

160.4

124.4

62

φ18.5

219

EX200-2/5/EX210/PC200-2/3

/ZAX230/EX220

160.4

124.4

62

φ18.5

219

 

The models above are just for reference,  we can't list all models here.we can supply more products as your requirement. Please feel free to send us your inquiry or email if you have any requirements.

 

 

3. Inspection Process

 

25MnB Steel  Track Shoes With High Strength Heat Treatment Material 1

 

4. Other Advantages

 

* World-class quality

* Factory sale directly with reasonable price

* 35 years' experience in Excavator & Bulldozer spare parts manufacturing

* Flexible payment terms including T/T, L/C and so on

* Fast delivery within 30 days after contract established

* After-sale services: video technical support,24h online support

 

 

5. Hot Sales

 

25MnB Steel  Track Shoes With High Strength Heat Treatment Material 2

 

6. FAQ

 

* You are a trader or a manufacture?

We are an industry and trade integration business, our factory loed in Quanzhou, and our sales department is in the center of Xiamen city.

 

* How can I be sure the part will fit my excavator?

Give us correct model number/machine serial number/ any numbers on the parts itself Or measure the parts give us dimension or drawing.

 

* What is your minimum order?

It depends on what you are buying. Normally, our minimum order is USD5000. one 20’ full container and LCL container (less than a container load) can be acceptable.

 

* What is your delivery time?

FOB Xiamen or any Chinese port: 35-45 days. If there are any parts in stock, our delivery time is only 7-10 days.

 

* What about Quality Control?

We have a perfect QC system for the perfect products. A team who will detect the product quality and specifiion piece carefully, monitoring every production process until packing is complete, to ensure product safety into the container.

Get in touch with us

Enter Your Message

You Might Be Into These