Durable Excavator Undercarriage Parts SUMITOMO Drive Sprocket 4-10 mm HRC Depth
Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | YT |
Model Number: | E70B/E110B/E120B/E180/E200B/E312/E320/E325/E330 |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1 PCS |
Price: | Negotiable |
Packaging Details: | Standard Export Packaging |
Delivery Time: | 7-30 Days |
Payment Terms: | L/C, T/T |
Supply Ability: | 10000 PCS/Month |
Detail Information |
|||
Material: | 25MnB Steel | Technique: | Forging/Casting |
---|---|---|---|
Quality: | Heat Treatment HRC 40-55 | HRC Depth: | 4-10 Mm |
Colour: | Yellow Or Black Or Customer Required | Warranty Time: | 12-18 Months |
Package: | Standard Export Packaging | Shipment: | By Air, Ship And Express |
High Light: | aftermarket undercarriage parts,undercarriage spare parts,25MnB Steel Track Shoes |
Product Description
25MnB Steel Track Shoes With High Strength Heat Treatment Track Pads
1. Excavator Track shoe Features
* All the track shoes are subject to through hardening processes with spray quenching technique and tempering processes, which are suitable for pitch range from 101mm to 260mm track link.
* We have different specifiions of track shoes from standard type to high wear resistance type that can meet all customers' different needs.
* We can make casting and forging track shoe which was used in mine and other special working conditions.
* The track shoe was made of special alloy boron steel material and after proper heat treatment, it can play under bend and high-wear effect in any working conditions.
2. Main Dimensions of Installation
MAIN PARAMETERS
Main Dimensions of Installation |
Suitable Model |
||||
A |
B |
C |
E |
H |
|
178.4 |
140.4 |
76.2 |
φ22.8 |
250 |
PC300/EX300-5/EX350LC-5 /PC27-7/ZAX300/SH330 |
178.4 |
140.4 |
76.2 |
φ22.8 |
250 |
|
184 |
146 |
76.2 |
φ22.8 |
250 |
EX400/EC460/PC300HD /PC400/EX400/PC360/WY160 |
184 |
146 |
76.2 |
φ22.8 |
250 |
|
184 |
146 |
76.2 |
φ24.6 |
247 |
PC400-5/6/PC300HD-3/5 /PC360LC-1/3/5 |
184 |
146 |
76.2 |
φ24.6 |
247 |
|
184 |
146 |
76.2 |
φ19.5 |
250 |
D95S |
190 |
140 |
76.2 |
φ23 |
250 |
E330/SK300/SK400 |
190 |
146 |
76.2 |
φ20.5 |
247 |
ZY65 |
178.4 |
138.4 |
72.2 |
φ20.5 |
236 |
PC300-1/3/5/PC250LC-6/PC300-5 /DH280/EX300-3/EX270 |
178.4 |
138.4 |
72.2 |
φ20.5 |
236 |
|
184.15 |
146 |
76.2 |
φ20.5 |
236 |
FH300/330/R450 |
179 |
129 |
72 |
φ21.0 |
236 |
325/E325ST |
160.4 |
124.4 |
62 |
φ20.5 |
219 |
DH220/EC210BLC/R220/ SK230/PC230/PC220/PC200-5/6/7 |
160.4 |
124.4 |
62 |
φ20.5 |
219 |
|
160.4 |
124.4 |
62 |
φ18.5 |
219 |
EX200-2/5/EX210/PC200-2/3 /ZAX230/EX220 |
160.4 |
124.4 |
62 |
φ18.5 |
219 |
The models above are just for reference, we can't list all models here.we can supply more products as your requirement. Please feel free to send us your inquiry or email if you have any requirements.
3. Inspection Process
4. Other Advantages
* World-class quality
* Factory sale directly with reasonable price
* 35 years' experience in Excavator & Bulldozer spare parts manufacturing
* Flexible payment terms including T/T, L/C and so on
* Fast delivery within 30 days after contract established
* Professional sales team, quality inspection and report, maritime logistics guidance
* After-sale services: video technical support,24h online support
5. Hot Sales
* You are a trader or a manufacture?
We are an industry and trade integration business, our factory loed in Quanzhou, and our sales department is in the center of Xiamen city.
* How can I be sure the part will fit my excavator?
Give us correct model number/machine serial number/ any numbers on the parts itself Or measure the parts give us dimension or drawing.
* How about the payment terms?
We usually accept T/T or L/C. other terms also could be negotiated.
* What is your minimum order?
It depends on what you are buying. Normally, our minimum order is USD5000. one 20’ full container and LCL container (less than a container load) can be acceptable.
* What is your delivery time?
FOB Xiamen or any Chinese port: 35-45 days. If there are any parts in stock, our delivery time is only 7-10 days.
* What about Quality Control?
We have a perfect QC system for the perfect products. A team who will detect the product quality and specifiion piece carefully, monitoring every production process until packing is complete, to ensure product safety into the container.
Enter Your Message